On this date, October 1st , 2021, in the presence of Mr. Teodor Osikovski – Manager of KMC EOOD, Mr. Pavel Lojsčík – Managing Director of the cluster – Czech Republic, Slovakia, Bulgaria, Hungary, Romania, Russia and Ukraine of Hitachi ABB Power Grids and Mr. Stefan Minchev – Executive Director of Hitachi ABB Power Grids for Bulgaria, was signed a contract with a subject “Replacement of sections 5BK, 5BY, 6BK, 6BY, BE, BF, BG, BH” with the Contracting authority Kozloduy NPP EAD, for a total value of BGN 8 334 462.00 excluding VAT and period of execution up to 40 months.
The activities shall include the development of a working project, delivery of basic equipment, spare parts, specialized tools, disassembly, assembly, adjustment and commissioning of the new MV sections.