KMC LTD completed the implementation of the assigned electrical installation works (disassembly and reassembly of cabinets and panels, cable marking and connection, etc.) of Kozloduy NPP Unit 5 on project “Replacement of RP-cabinets, panels with R/I converters, cross cabinets and power supply panels of instrumentation sensors on I and II loop”, covering the implementation of design, delivery, installation and commissioning of an integrated system for power supply, conversion and propagation through modernization of propagation cabinets, signal conversion cabinets, power supply panels for instrumentation sensors and cross cabinets of normal operating systems for the first and second loop with general contractor Westinghouse Energy Systems LLC – Bulgaria Branch KCHT.
Share this post